IC Implementation with fully integrated Signal Integrity and Power Integrity

This demo shows how Blast Fusion, Blast Noise® and Blast RailTM work concurrently throughout the IC implementation flow to achieve timing closure while addressing signal and power integrity issues. Tight integration of signal and power integrity capabilities ensures a correct-by-construction methodology and also enables the designer to address these problems without having to leave the Magma environment.

Get Demo | Previous Page | Downloads Search

If you found this page useful, bookmark and share it on: